The last batch of snowmaking water pipeline was delivered this morning!
Last summer we added a new pump house, as well as a pipeline to the top of the Hooter Chairlift and another halfway to Black Bear.
This summer we’ll pick up where we left off, near the top of Sneaky, and bring snowmaking to the base of Black Bear Chairlift for winter 2019-20!